Towpath Trail

Towpath Trail under construction with 1842 enlarged Erie Canal to the left beyond the trees.
Towpath Trail
August 29, 2016
Mayor McCarthy and Philip Morris prepare to cut the ribbon for the Visitor Center.
Let’s Roll Up our Sleeves…
October 6, 2016
Show all

Towpath Trail

This dump truck backed over a half mile into the woods to get a load of debris!

This dump truck backed over a half mile into the woods to get a load of debris!

Towpath Trail Construction Map

Towpath Trail Construction Map

Construction continues on the Towpath Trail.  Clearing a grubbing of the entire length (shown above in red) will be completed shortly.    The contractor is trying to move a barge into Weger’s Pond outlet on which a pile driver can be mounted.  The piles are necessary as a foundation for the 140 foot bridge across the outlet.  The bridge will arrive in 20 foot sections.  The fabricated bridge will be lifted in place by two “small” cranes at either end of the trail.

This dump truck backed over a half mile into the woods to get a load of debris!

This dump truck backed over a half mile into the woods to get a load of debris!

This view at left was taken from atop the farmer’s bridge abutment to the east of Clutes Dry Dock. You can see that the trail is wide enough for a good size excavator as well as the construction sized dump truck.

This week the Preserve is closed to all but duck hunters, so work on the eastern Halfmoon end of the trail will be the focus.

Work on the 10 foot wide stone dust trail is expected to be complete by the end of the year.  Its is truly exciting to see the progress.  This will be a wonderful recreational recourse for the Byway corridor.

Comments are closed.